1.Removal of garbage and unwanted things in proposed construction site
You must remove all the garbage and unnecessary items that may be there before building a house. Because if there are unnecessary plastic items or other items there, there is a chance that they will disappear in the soil when the foundation for building a house is laid. Without knowing it, when we use that soil, those unnecessary items will remain intact in the soil without decaying. Therefore, the place where the house is being built should always be kept clean. The first thing to do is to remove the unnecessary items

2. Identifying of place for installing of temporary shed for cement stock and workers stay
Before starting the construction of the house, we must first set up a place for the workers to stay. Because these days, we are bringing in workers from outside the country for the construction of the house. In that case, it is our duty to prepare a place for them to stay. Not only that, You also need to set up a separate thing to keep the cement bags safe because cement bags should not be kept outside. We definitely need to do this to ensure that the cement does not get damaged in case of rain or any other problems.

3. Enquiring of details of adjacent land owners if it’s vacant and required for our construction purpose
If there is any vacant land, it is better to get permission from the owner of that land in advance. This is because I can set up a set for our workers there, and not only that, I can also keep the materials needed to build our house with them. Therefore, it is better to get permission from them and use that land.

4. Enquiring about groundwater yield with neighbor house and Identifying of water yield for drilling of bore well by traditional or scientific method
Water is a very important requirement for building a house. To know if the water is good, you can ask the people living nearby. Because if the water we are going to use is not good, that is, if it is salt water, there is a high chance that the walls of our house will be damaged by that water and it will easily deteriorate. Therefore, the water must be good water. If you do not know any details about the water, then get the water tested and if the report comes that the water is suitable for building a house, we can use the water.

5. Applying for temporary supply of electricity from TNEB
Before that, you should establish the electricity requirement at that place because electricity is essential for running the machines and other needs during the construction of the house. Therefore, you should apply to the Electricity Board for temporary electricity requirement and obtain electricity in advance. This electricity demand will take at least two weeks to a month. Therefore, it is better to think in advance and purchase electricity from the Tamil Nadu Electricity Board (TNEB) before starting the work.

6. Check the site measurement at site. If required fix the surveyors for taking the site measurements using total station survey instruments
Before building a house, you should first check the size of the house. If your land is large or you have a steep slope that you cannot measure your land, the surveyors help you measure the size of your house using Total station survey instruments.

7. Fixing of bhoomi pooja dates
It is an important requirement to note the Auspicious day for performing Bhoomi Puja in advance. After that you can make arrangements for other works.

8. Bhoomi pooja by Iyer or Mason team. If Iyer, book the iyer immediately.
Once you have decided on the date of the Bhoomi Puja, prepare the Iyer or Mason Team for it because there is a possibility that they will be committed to other places on the auspicious day, so it is better to inform them in advance.

9. Fixing of soil testing contractor if soil is clay
Just like water, you need to know the soil that may be there well. You need to know if that soil is of good quality for building a house. If the soil is clay or something like different You also need to conduct a soil test and build a house with it. Because if the soil you are building on is clay, you will need to lay the foundation two or three times thicker than normal, depending on the quality of the soil.

10. Scrutinizing of land documents, whether it’s patta, approved layout, building plan approval and others
One of the most important things to have is that the place where the house is built must be a place approved by the government. Before building the house, the house plan and floor plan must be shown to the government officials and after getting permission, the construction work must begin.

11. Finalization of working plan for all floors including terrace floor along with furniture layout, CP and Sanitary ware Fittings, Wardrobe and Loft, and Joinery details
Before start the work, Finalize the work plan for all floors including the terrace floor with furniture layout, CP and sanitary fixture fittings, wardrobe and loft, and joint details. After deciding everything, we should start doing housework.

12. Finalization of elevation drawings
The elevation of the house should be completed first before starting the construction of the house. Any changes to the house after the work has begun can change the appearance of the house. Therefore, before building the house, definitely decide on the elevation of the house and start the house work.

13. Preparation of Structural, Electrical and Plumbing design and drawings
While preparing the elevation of the house, you should prepare the drawings for the electrical and plumbing structures of the house. Because the correct layout can only be given if the layout of the house and the water pipes are designed in advance, otherwise there is a high chance that the house layout will not be correct. You should not be careless about taking care of them after the work on the house has started.

14. Finalization of estimate, payment schedule and specification
When you talk to your construction engineers about the construction of your house, it is a good idea to discuss the payment schedule, including when, how much, and what you will be paying for. This schedule will help you resolve any delays or other payment issues.

15. Applying for proposed building construction approval from CMDA or appropriate authority
If you are planning to build a new apartment or Duplex Villa building, you must first apply for a certificate of occupancy (CMDA or Appropriate Authority) because you can only build a house after the government has approved your location as a suitable location for an apartment or Duplex Villa building.

16. Drafting and finalization of construction agreement along with protocol for point of contact details
Once you have decided everything with the construction companies, immediately sign the agreement. When signing the agreement, you should read and understand all the details in it carefully before signing it. Otherwise, if any problem arises in the future, there is a chance that the construction company will abandon you. Therefore, it is important that you know and sign it well.

17. Creating project code and open the new file for keeping the agreement, drawings and important documents
Before the construction of the house begins, keep the government-approved certificate you have already registered for it, the contract you have signed with the office you approached for the construction of the house, and the contract you have signed with other contractors for the construction of your house in a file. Not only this, but also keep it in a file for all the activities you are going to do. Always keep it in case you have any problems or for your safety.

18. Appointment of contractors for all the works. Contractors for
The mistake that most people make here is that they are negligent in house construction work. For example, they only look for people for it when it comes to water pipe work in the house. Please don’t make that mistake. You should also select the people for it in advance before the construction work of your house starts. Only then will you not have any trouble at that time.
Keep Confirm the Following to before you start build your home;
i) Masonry and Shuttering works.
ii) Electrical works.
iii) Plumbing works.
iv) Joinery works.
v) Tiles and granite works.
vi) Painting works.
vii) Water proofing works.
viii) Grill works.
ix) Elevation works.
x) Interior design.

19. Finalization of rate for all sub contractors
Make sure to clearly discuss the work and salary with all the contractors and workers you have selected in advance. Because this is likely to become a big problem in the future. Therefore, it is better to discuss everything in advance before starting work.

20. Preparation and finalization agreement for all sub contractors
Once you have negotiated the wages with all the contractors, immediately sign their contracts because this contract will serve as evidence if they ask for too much money or if the work is not completed on time.